System Design, Planning & Management <br /> Lead Lead <br /> Multi -Year Strategies FY 95 Tasks Staff Division Source <br /> o Develop Comprehensive Basin Plans 1) Complete the adoption process for CSWMP <br /> - Refine the Eugene Areawide Drainage and the Natural Resource Functional <br /> Plan Plan. Identify funding for the development <br /> - Develop a Stormwater Facility Plan of comprehensive basin plans. <br /> 2) Develop prospectus and schedule for <br /> completing basin plans. <br /> 3) Identify staff and consultant resources. <br /> 4) Initiate project. <br /> o Design and fund a multipte f ctives pilot 1) Establish a staff team. <br /> project for a small, urbanized drainage basin. 2) Develop review criteria. <br /> 3) Develop project proposals. <br /> 4) Coordinate with a citizen committee. <br /> o Determine the feasibility of establishing <br /> and maintaining water quality treatment <br /> facilities and retrofitting existing drainage <br /> and floor control facilities to function as <br /> water quality treatment facilities. <br /> o Research and implement techniques that will 1) • Install bike -proof catch -basin grates. <br /> make the system more effective and efficient. <br /> - Transition "tip -up" connectors to connections <br /> that require less maintenance. <br /> - Study possible solutions related to undersize <br /> private crossings of drainage -ways. <br /> - Implement engineering solutions to address <br /> severe overbank flooding on the Amazon Creek. <br /> - Provide increased pipe/channel in shallow areas <br /> of the drainage system. <br /> - Maximize the capacity of existing facilities <br /> by using runoff slowing/lowering techniques. <br /> o Develop & implement a proactive drainage 1) Identify acquisition priorities and develop a process. <br /> channel/water quality acquisition program 2) Secure right -of -way easements to major drainage -ways. <br /> o Develop a comprehensive stormwater/ <br /> wetland information system. <br /> - Develop a Storm Sampling Program 1) Develop strategies for assuming lead role <br /> 2) Purchase and equip sampling vehicle. <br /> 3) Asume stormwater sampling responsibilities. <br /> • <br /> - Conduct Ambient Receiving Water Sampling 1) Select monitoring locations. <br /> 2) Select list of parameters for analysis. <br /> 3) Obtain and install monitoring station equipment. <br /> 4) Assess discharges upstream from WWTP. <br /> - Develop Water Quality Data Management, 1) Develop database for storm and ambient <br /> Analysis and Reporting Capability monitoring information <br /> • <br /> 2) Develop sample collection, analysis and <br /> data evaluation protocols. <br /> - Develop and keep up- to-date- inventories 1) Design and develop information management <br /> and maps of the storm sewer system. systems that describe water quality conditions <br /> and options. <br /> Storm Event Monitoring 1) Record precipitation data throughout the urban <br /> growth area. <br /> o Submit required state and federal plans and 1) Coordinate FY 95 NPDES Evaluation <br /> permit applications. 2) Submit West Eugene Wetlands Plan Amendment <br /> o Encourage and support communication, <br /> coordination, and cooperative efforts that <br /> maximize available resources, reduce duplication <br /> of services, and prevent management <br /> conflicts. <br /> o Establish Staff Coordinating Committee <br /> o Identify and obtain space required for - <br /> service staff. <br /> , (a:jvc:pw4:wkptsw)07 /15/94 <br />