New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Workplan Storm, Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Workplan Storm, Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 10:53:34 AM
Creation date
7/10/2014 10:53:15 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Inspection, Enforcement, Monitoring _ <br /> Lead Lead <br /> Multi -Year Strategies FY 95 Tasks Staff Division Source <br /> o Reduce the incidence and damage resulting <br /> from hazardous spills & illegal dumping. <br /> - Clean up polluting spills /dumps. 1) Develop an on call team. <br /> 2) Coordinate spill response and mitigation <br /> with fire units and HAZMAT. <br /> 3) Develop joint DPS -PW response procedures. <br /> 4) Research and revise documents regarding .ar• • <br /> — spill response and illegal dumping programs. <br /> 5) Develop cooperative agreements with <br /> relevant agencies. <br /> - Strengthen enforcement for illicit connections/ 1) Review and Modify existing code <br /> discharges 2) Review Enforcement actions and implement <br /> authority to issue fines. Develop enforcement - <br /> manual. <br /> - Improve Field Screening for illicit connections/ 1) Develop a field screening/investigations <br /> discharges manual. <br /> 2) Coordinate activities and information sources <br /> for detecting illicit discharges. <br /> 3) Develop a full screening/investigations <br /> training program. • <br /> - Monitor Industrial Facilities 1) Coordinate w/ DEQ on a strategy for <br /> inspecting & monitoring industries regulated <br /> by NPDES permits. <br /> 2) Develop an industrial monitoring plan. <br /> 3) Develop database to track industrial users. <br /> o Modify Development Regulations/Information <br /> - Street Design Standards <br /> - Erosion Control Program <br /> - Development Standards for Floor & Water 1) Establish a community task force to assist <br /> Quality with revisionldevelopmente of new standards <br /> 2) Reserach and review approaches for <br /> development standards. <br /> 3) Finalize modifications and develop a method <br /> for assessing effectiveness. <br /> 4) Establish a method to track and ensure compliance. <br /> 5) Add natural resource buffer setbacks and <br /> wetland. <br /> 6) Modify construction site requirements. <br /> 7) Strenthen tree preservation and hillside <br /> development regulations in Willow Creek/Amazon <br /> to protect water quality. <br /> - Education for Design Practices 1) Conduct research regarding structural <br /> techniques to reduce impacts on water quality. <br /> 2) Develop educational materials for distribution. <br /> • <br /> (a:jvc:pw4wkplsw)07 /15/94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.