New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Workplan Storm, Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Workplan Storm, Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 10:53:34 AM
Creation date
7/10/2014 10:53:15 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Follow -Up Tasks to July 7. 1994 Stormwater Service Team Meeting <br /> Date <br /> Needed to <br /> Create <br /> • <br /> Service <br /> Ji orkp1.an <br /> Draft for <br /> Task 7/27 Mtg. <br /> 1. Refine Values Sandra and Mary 7/22 (to <br /> Jenny) <br /> 2. Review Issues & Trends Section Tony (L). Sandra. 7/22 (to <br /> of mockup. Roland. Jenny Jenny) <br /> 3. Develop resource allocation Glen(L) <br /> bar chart (identify buckets); Michelle. Les. 7/15 buckets <br /> Les 7/22 <br /> Sandra bar chart <br /> Jenny (to Johnny <br /> Johnny & Jenny) <br /> Revise Service Description 7/22 <br /> section of mockup. Johnny (L) svc. des. <br /> (to Jenny) <br /> 4. Summarize Goals & Long Term Jenny 7/15 <br /> Performance Targets; Review draft out <br /> Multi -Year Strategies to team <br /> & FY 95 Tasks for each goal; <br /> Distribute Revised Draft to 7/22 <br /> Service Team for edits. edits due <br /> to Jenny <br /> • <br /> (a:jvc:pw3:swdo) <br />
The URL can be used to link to this page
Your browser does not support the video tag.