New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Workplan Storm, Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Workplan Storm, Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 10:53:34 AM
Creation date
7/10/2014 10:53:15 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ .geT GOAL AND OBJECTIVES <br /> EXAMPLE <br /> Decrease <br /> processing <br /> time for plan <br /> checking and <br /> inspections <br /> Reduce <br /> demand for <br /> customer <br /> contacts by <br /> 25% before <br /> Improve September <br /> capacity to . 1 9 9 4 <br /> measure Plan <br /> Review time Manage <br /> by January Complete service <br /> 1995 inspections fluctuations Reduce <br /> within 24 to meet or Supplemental <br /> hours of exceed cycle Reviews by <br /> request 95% time 20% <br /> of the time standards for <br /> by 19XX plan checking. <br />
The URL can be used to link to this page
Your browser does not support the video tag.