STORMWATER MANAGEMENT PROGRAM <br /> INTERIM DEVELOPMENT GUIDELINES Draft # 1 <br /> TECHNICAL MEMORANDUM NO. <br /> Figure 3. Building Permit Review Process <br /> I i <br /> Building Permit Process <br /> Preapplication <br /> (Optional) <br /> Land Use <br /> Issues I <br /> i <br /> Code Issues <br /> 1 <br /> i Consultations i <br /> Application <br /> I I <br /> I Site Review I <br /> I Structural Review <br /> Landuse Electrical <br /> Verification Plumbing <br /> Engineering Mechanical <br /> Transportation <br /> Building <br /> • Fire Review <br /> Code Review <br /> i <br /> I Fee Calculation <br /> I <br /> Construction/Inspection <br /> -1 11 <br /> , 11 I <br /> Project Complete I <br /> h I . <br /> Table 1, on the following page, lists the technical reviews associated with building <br /> construction permits. <br /> • <br /> Page - <br />