TASKS FOR PERMIT YEAR 3 (Continued) <br /> P &A1 BMP FACT SHEET - Develop Comprehensive Basin Plans <br /> Task 5: • Begin implementation of the program and analyze monitoring results on a long -term basis. Initiate additional <br /> basin studies if appropriate. (Note: the basin plans will be developed to provide guidance for all activities <br /> conducted within the basins. Therefore, implementation of the program means that the plans will begin to be <br /> used in a formal way as guidance for other activities that are conducted within the basins). <br /> This BMP can be used to prioritize and review the implementation of other BMPs. <br /> P &A2 - BMP FACT SHEET - Street Design Standards <br /> Task 4: • Implement new design standards as appropriate. <br /> • Conduct periodic review (to coincide with permit renewal) of design handbooks (with respect to water <br /> quality). <br /> P &A3 - Incentives to Preserve Private Property <br /> Task 2: • If this BMP is determined feasible, develop an incentive program. Criteria will be developed for determining <br /> whether or not a particular "natural area" qualifies under the incentive program. The City will determine <br /> how incentives would be calculated. <br /> • Obtain necessary approvals for the program and implement. Implementation should include educating the <br /> public about the program along with agency personnel who will administer it. Coordinate with ED4 <br /> P &A4 - Erosion Control Program <br /> Task 5: • Implement the erosion control program. <br /> P &A7 - Standards for New Development <br /> Task 5: • Implement new development standards (including inspections and enforcement). Begin applying requirements <br /> to all new developments. <br /> P &A8 - Mitigation Site Management <br /> Task 3: • Develop maintenance plans for the public sites selected <br /> P &A9 - Mitigation Site Management <br /> Task 3: • Develop maintenance plans for the public sites selected. <br /> \ 91C0753A\ TASK6 \FINALBMP\FACrSHTS\RESP- PTY.PY3 01/04/96 2 <br />