r <br /> construction activities on the same parcel of land that are <br /> proposed in connection with a development, including utility <br /> work, private infrastructure, structures, and other site <br /> improvements. <br /> 3. Annual permit. An annual permit may be issued for <br /> minor recurring activities. <br /> (c) Application. The application for an erosion prevention <br /> permit shall be accompanied by: <br /> 1. Fee. A fee established by the city manager <br /> pursuant to section 2.020 of this code in an amount sufficient <br /> to recover the city's administrative costs; <br /> 2. Construction site management plan for individual <br /> and umbrella permits. A construction site management plan <br /> prepared by a certified professional(s) designated by the <br /> manager in rules adopted hereunder. The construction site <br /> management plan need not be prepared by a certified <br /> professional if the development is one (1) single family <br /> dwelling or one (1) duplex dwelling. The construction site <br /> management plan shall be kept at the construction site and <br /> available for on -site inspection purposes. The construction <br /> site management plan shall identify: potential water quality <br /> impacts associated with the proposed construction activities: <br /> techniques and methods to be used to prevent and control <br /> erosion, sedimentation, and other pollutants associated with <br /> construction activity; and the location, design, and <br /> construction schedule for all erosion, sedimentation, and <br /> other construction site management control measures to be <br /> implemented and maintained; and <br /> 3. Work. scope and practices for annual permit. No <br /> construction site management plan shall be required for an <br /> annual permit. Instead, the applicant shall provide a <br /> description of the scope of work to be performed and the best <br /> management practices to be employed for meeting the <br /> requirements of sections 6.625 to 6.645 of this code. A copy <br /> of the annual permit shall be kept at the site and available <br /> for on -site inspection purposes. <br /> (d) Review and Issuance. The application for the erosion <br /> prevention permit shall be reviewed by the city and approved, <br /> approved with conditions, or denied, based on criteria set forth in <br /> rules adopted by the city manager. The criteria to be adopted shall <br /> be designed to achieve the objectives listed in section 6.625. <br /> Issuance of an erosion prevention permit may be subject to <br /> conditions imposed by the city including, but not limited to, <br /> Ordinance - 3 07/12/96 <br />