New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Stormwater Erosion
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Stormwater Erosion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 4:04:38 PM
Creation date
7/9/2014 4:04:27 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ISSUES RESPONSE REFERENCE <br /> 10% slope is not steep No Change. Per cent grade is a significant No change. <br /> enough to merit sensitive factor in the effect of construction activities <br /> area status. on the stormwater system. <br /> Preexisting conditions Change. Allows existing site conditions, Admin Rules: <br /> should be considered for such as buildings, paving, landscaping and R- 6.645- E.2.2. <br /> determining sensitive drainage patterns, to be factored in when <br /> areas. determining sensitive area status. For <br /> example, the construction area of a site that <br /> contains an open water body may not pose an <br /> erosion risk due to the site's direction and <br /> pattern of drainage. <br /> Duration of permit review Minor Change. Although the 30 - day Admin Rules: <br /> process should match turnaround was supported by the DAC, staff R- 6.6445 -A.2; <br /> DEQ's - automatically was not able to resolve concerns about the R- 6.645 -F.5; <br /> issued within 30 days. implications of this approach both in terms of R- 6.645 -F.6. <br /> potential increased risks to water quality - due <br /> to lack of permit review - and to the precedent <br /> setting nature for other regulatory programs. <br /> Staff is committed to various techniques to <br /> expedite the permit review process such as <br /> concurrent processing of building and erosion <br /> permits. <br /> Requirements for 2 foot Change. Doesn't specify contour information Admin Rules: <br /> contour maps is excessive. but requires adequate site data to determine R- 6.645- F.7.2.2. <br /> drainage patterns and slopes through <br /> elevations and/or topographic information. <br /> Requirement for showing Change. Requires on -site and off -site routes Admin Rules: <br /> vehicle access routes is too to be shown on Construction Site R- 6.645- F.7.2.4. <br /> vague. Management Plan. <br /> Wheel Washing For Change. Items listed in Section R- 6.645 -F.7.2 Admin Rules: <br /> Construction Vehicles. are not mandatory but must be considered R- 6.645- F.7.2. <br /> when preparing the Plan. <br /> Enforcement too punitive. Change. Intent of enforcement program is to Admin Rules: <br /> match level of enforcement measures to the R- 6.645 -H.1. <br /> extent of the violation. This was clarified in <br /> the enforcement section. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.