New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Water Maintenance Costs - Budget
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Water Maintenance Costs - Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:50:52 PM
Creation date
7/9/2014 3:50:50 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLARK COUNTY <br /> STORM AND SURFACE WATER UTILITY <br /> MAINTENANCE STANDARDS & PRACTICES <br /> M1. Vegetation Control May 1 - October 15 <br /> Mowing Approximately four times to a height of 2 to 4 inches, one <br /> mowing to be done between June 1 - July 1. <br /> Noxious Weeds Tansy ragwort, poison oak, purple loose strife, Canadian <br /> thistle, blackberries, and any other weed under control of <br /> the Noxious Weed Board shall be controlled by hand <br /> removal or spraying. <br /> Spraying Access roads to facilities and fence lines to be sprayed <br /> with an application of Roundup or per each facility work <br /> plan. <br /> Fertilizing Grass areas are to be fertilized once a year as needed or <br /> per the facility work plan. <br /> M2. Plants /Shrubs/Trees February 1 September 1 <br /> Pruning Once a year, or as needed, if trees or shrubs are blocking <br /> stream flow or equipment access. <br /> Weeding Four times a year for new planting in the first and second <br /> year; three times in the third and fourth years; then two <br /> times thereafter, per each facility work plan. <br /> Fertilizing Once a year for the first four years of new planting, then <br /> as needed, per each facility or area work plan. <br /> Watering Average of once a month between May 1 - October 1, or <br /> as needed for new plantings in the first through the fourth <br /> year of growth; thereafter, per each facility work plan. <br /> Clark County Storm & Surface Water Utility Apri11996 <br /> Maintenance & Operations Cost Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.