New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Sewer System
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:10:14 PM
Creation date
7/9/2014 3:09:45 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
gave a rating from 1 to 11, with 1 being the most important and 11 least important. The results <br /> are shown in Attachment Seven. <br /> C. Small Group Exercises. The next two exercises were conducted in separate groups. The <br /> goals of these exercises were to identify the "external" and internal actions needed to adopt and <br /> implement the development standards. <br /> 1. External Actions and Processes. This exercise focused on the actions and processes needed . <br /> to put in place the necessary framework for implementing the development standards and basin <br /> plans. Refer to Attachment Eight. <br /> 2. Internal Actions. This exercise focused on defining the coordination needs between City <br /> departments and divisions. Refer to Attachment Nine. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.