New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Sewer System
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:10:14 PM
Creation date
7/9/2014 3:09:45 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
08/22/95 TtJ 09 =_4 FAX WOODWARD CLYDE y <br /> n, <br /> • Option 5) Require r <br /> uire on -site facilities for all new development for waIi a141y?y ' ' �. <br /> and construct regional facilities for flood control. +snlcdF6!C} <br /> O <br /> � ' 0 tip <br /> Option Require quire on -site facilities for all new development or ��co� r�} v <br /> P <br /> and construct regional facilities for water quality control. . �YO�o <br /> P <br /> 2riYi"CfX i t'. :: oil br — 9 ` cr T9Y,t19Q <br /> Option 7) Require on -site facilities for water quality and wat gh n re Tonal <br /> and include an allowance for developers to construe 2sxt <br /> facilities. MT 25.1 - nh als to �Ii <br /> • For each of the options listed above, a decision will also need to be made, regarding who <br /> would pay for and who would be responsible for the various phases of design, permitting, <br /> construction, and maintenance. For example, if option number �e r developers to be chosen, a <br /> decision would need to be ible for design, construction, and <br /> y or en maintenance of the <br /> owners) would be respons <br /> facility, and who would pay. <br /> 5.0 STAFF RECOMMENDED APPROACH FOR THE CITY OF EUGENE <br /> We will conduct a meeting with the City of Eugene on August 24 to discuss s these options <br /> and decide how best to proceed. This section of Technical Memorandum <br /> completed after that meeting. Attachment #2 is a blank table that lists some key <br /> attributes that will be considered during the process of deciding upon a policy for <br /> stormwater controls. <br /> 6.0 REFERENCES <br /> Og <br /> Clackamas County - Ela Whelan <br /> City of Corvallis - Sue Steppin <br /> City of Portland - Patty Nelson and Mark Batista <br /> City of Salem - Gay Snyder <br /> City of Springfield - George Walker <br /> Unified Sewerage Agency, Washington County - Lori Faha <br /> Washing , <br /> City'of"�ellevue - Linda Harris <br /> City of Olympia - Mark Blosser <br /> Department of Ecology - Stormwater Management Manual for the Puget Sound Basin <br /> King County - Bruce Johnson <br /> • <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.