i <br /> MEMO <br /> July 7, 1995 <br /> To: Brian El iott <br /> Subject: Storm Sewer Improvements <br /> From: Bob Staley <br /> Following is A summary of costs estimates that I have prepared on various <br /> proposed storm sewer improvement projects. I will also attach A sketcq of each <br /> project along with a detailed budget estimate sheet. After you and Fred have <br /> reviewed I think we should meet with the storm water team and review. The <br /> storm water team could request additional improvements. <br /> With Maintenance and storm water quality approval.the East Team is ready to <br /> start the survey and design phase with A planned completion date for <br /> construction of late fall 1995. <br /> Location Cost Notes <br /> 1. 41st. and Potter 40.200.00 This is A must do <br /> project A planned <br /> development will <br /> connect to the end <br /> of the proposed <br /> pipe. <br /> 2. 22nd. and Mcillan 7,000.00 This one could be a <br /> EWEB problem. <br /> 3. Wendover and Clairmont 3,305.00 You do not know about <br /> this one, A fix to two <br /> subdivisions meeting <br /> and one taking <br /> responsibility. <br /> 4. 11th. and Monroe 35,410.00 This one is A costly <br /> fix but must be done <br /> to eliminate I /I. <br /> 5. Conger and Wilson 560,100.00 I want to review this <br /> Alt one with the storm <br /> 367,100.00 water crew. <br /> 6. Monroe /Madison at 10,700 (roads) I think by changing to <br /> 27th. and 28th. 10,225 (parks) 4A inlets at 27th and <br />