New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Sewer System
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:10:14 PM
Creation date
7/9/2014 3:09:45 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IMPACTS ASSOCIATED WITH <br /> NEW DEVELOPMENT <br /> (Continued) <br /> • An increase in streambank erosion, scour <br /> and inciting <br /> • Increased deposition of newly eroded <br /> debris and sediment, which reduces flood <br /> conveyance capacity and clogs fish <br /> spawning gravels <br /> • Reduced streamflows during drought <br /> conditions due to reduced levels of <br /> infiltration in the watershed (and, hence, <br /> reduced groundwater recharge to the <br /> creek) <br /> • Impaired water quality as a result of <br /> accumulated sediments which attract and <br /> _ .. carry pollutants �.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.