New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Street Tree Program
COE
>
PW
>
POS_PWM
>
Parks
>
Street Trees.Urban Forestry
>
Street Tree Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 11:32:07 AM
Creation date
7/9/2014 11:31:54 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' Tree establishment: <br /> Annual maintenance inspections over three -year establishment period (per year) $0.25/ft* <br /> Final establishment inspection $0.25/ft* <br /> In addition to the above fees, a security bond or cash deposit sufficient to ensure <br /> performance under the approved Street Tree Plan shall be provided to the City as <br /> follows: <br /> Tree establishment bond $7.12/ft.* <br /> Trees which fail during the establishment period and are replaced will extend the <br /> establishment period an additional three years from the date of the replanting for those <br /> trees. <br /> The developer may either request the release of the security bond or cash deposit once <br /> all trees on the development have completed their establishment period, or annually <br /> request the release of the security bond or cash deposit for the linear footage of right of <br /> way in which the trees have completed their establishment period. <br /> 3. City planting option: <br /> Development of a street tree plan agreement $100.00 <br /> Tree establishment: <br /> In addition to the above fee, Developer shall pay the City a one -time fee equal to the <br /> estimated total cost to the City for the purchase, installation, and establishment of the <br /> street trees planted by the City in accordance with R -7.280 and the approved Street Tree <br /> Plan. This fee does not equal a "per tree" cost nor represent a specific number of trees <br /> that the City will plant. The total cost to the City for purchasing, installing, and <br /> establishing the trees in accordance with the Developer's Street Tree Plan shall be <br /> calculated as follows $7.12/ft.* <br /> Developer is not entitled to a refund of any portion of this one -time fee, nor is <br /> Developer required to pay any amount in addition to this one -time fee, based on the <br /> number of trees actually planted by the City. The City will track lot development, <br /> negotiate species with new home owners, plant the new trees, and ensure they become <br /> established. The City will be responsible for replacement of any trees that fail to <br /> survive the establishment period. <br /> For purposes of this fee schedule, the term "development site" means a tract of land under common ownership <br /> or control, either undivided or consisting of two or more contiguous lots of record. Property under common <br /> ownership that is bisected by a public street or alley shall be considered one development site, unless the land was <br /> legally divided. <br /> • <br /> *Footage is the total footage of the development site that abuts street right of way. <br /> Exhibit A to Administrative Order No. 58- 04 -03 -F — Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.