New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Tree Permit Statistics
COE
>
PW
>
POS_PWM
>
Parks
>
Street Trees.Urban Forestry
>
Tree Permit Statistics
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 11:12:31 AM
Creation date
7/9/2014 11:12:26 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Local Street Plan due to the unforseen effects that Measure 47 is expected to have on our <br /> community. <br /> Wig: The provisions relating to trees in the Local Street Plan and the City's <br /> Street Tree Program are funded through the Road Fund which is not dependent on <br /> property tax revenues which are expected to be impacted by Measure 47. Staffing for this <br /> program is intended to be funded through fees the program generates. <br /> Comment 14: The rules are vague in several areas that leave too much room for <br /> interpretation, thus resulting in added delays in processing time for building .permits. <br /> Finding: Section 7.280(3) of the Eugene Code, 1971 requires a developer to 'obtain <br /> approval of a Street Tree Plan prior to receiving approval of a final plat. Since approval <br /> of the final .plat occurs prior to submission of applications for building permits, it is not <br /> anticipated that this requirement will impact building permit.processing time. Since no <br /> specific examples of "vagueness" are cited, no response can be made to that portion of the <br /> comment, nor modification or clarification of the rules. <br /> Comment 15: The added costs associated with the Local Street Plan amount to <br /> $1,099 per subdivision lot. <br /> Finding: The cost analysis cited was prepared using the option in which the <br /> developer, plants and establishes the street trees. While not debating the costs cited, a <br /> number of the items listed represented subcontractor or supplier costs to be incurred by <br /> the developer, and not practicable for city staff to verify. <br /> However, when comparing these costs to those using the option in which the City <br /> plants and establishes the street trees we arrive at similar figures. For example, a lot with <br /> 90 -100 feet of street frontage could require three trees costing $900 $1200 depending on <br /> whether it was classified as a 1oea1 or collector street. A lot with 50-60 feet of street <br /> frontage could require two trees costing $600- $800. <br /> Therefore, depending on the average size of the subdivision lots, these costs are <br /> accurate and generally within the range of cost anticipated. Therefore, there, is no need <br /> to adjust the rule <br /> Comment 16: Every lot is subject to a set of CC&Rs that require the approval of <br /> a Landscape Plan that includes Street Trees. In those CC&Rs the homeowner is required <br /> to maintain the trees. If they do not then the Architectural Control Committee or the City <br /> of Eugene has the right to enforce the CC &Rs. <br /> Finding: Section 7.280(3) of the Eugene Code, 1971 requires a developer to obtain <br /> approval of a Street Tree Plan prior to receiving approval of the final plat. The purpose <br /> Administrative Order - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.