rrâ–º <br /> (e) Natural resource areas designated on the Metro Plan diagram as "Natural <br /> Resource" and areas identified in any city - adopted natural resource <br /> inventory are protected. Protection shall include the area of the resource <br /> and a minimum 50 foot buffer around the perimeter of the natural resource <br /> area. <br /> (4) The proposal complies with all applicable standards, including, but not limited <br /> to: <br /> (a) EC 9.6705 Development in Flood Plains. <br /> (b) EC 9.6710 Geotechnical Analysis. <br /> (c) EC 9.6730 Pedestrian Circulation On -Site. <br /> (d) EC 9.6735 Public Access Required. <br /> (e) EC 9.6750 Special Setback Standards. <br /> (f) EC 9.6775 Underground Utilities. <br /> (g) EC 9.6780 Vision Clearance Area. <br /> (h) An approved adjustment to a standard pursuant to the provisions <br /> beginning at EC 9.8015 of this land use code constitutes compliance with <br /> the standard. <br /> (5) Public improvements as required by this land use code or as a condition of <br /> tentative plan approval have been completed, or <br /> (a) A performance bond or suitable substitute as agreed upon by the city has <br /> been filed with the city finance officer in an amount sufficient to assure the <br /> completion of all required public improvements; or <br /> (b) A petition for public improvements and for the assessment of the real <br /> property for the improvements has been signed by the property owner <br /> seeking the conditional use permit, and the petition has been accepted by <br /> the city engineer. <br /> 9.8105 Conditional Use Permits within the NR Natural Resource Zone or /WB Wetland <br /> Buffer Overlay Zone. - <br /> (1) Purpose. This classification of conditional use is provided in order to facilitate <br /> special review of certain uses within the natural resource zone or the wetland <br /> buffer overlay zone. It is intended to implement policies in the adopted West <br /> Eugene Wetlands Plan or other applicable plans. <br /> (2) Criteria for Hearings Official Approval. Applications for conditional use <br /> permits within the NR natural resource zone or /WB wetland buffer overlay <br /> zone shall be processed and scheduled for public hearings in the same manner as <br /> other conditional use permit applications, except that NR standards (2) through <br /> (19) listed in EC 9.2530 Natural Resources Special Standards shall be <br /> considered as additional criteria along with the criteria listed in EC 9.8090 <br /> Conditional Use Permit Approval Criteria. <br /> 9.8110 Conditional Use Permit, Modification Approval Criteria. After the effective date <br /> of the approval of the conditional use permit, modifications to the approved <br /> Ordinance - 342 <br />