• <br /> Tree was located in protected natural resource area 20 <br /> Attributes that made an area sensitive were damaged during the 10 <br /> removal process <br /> Removal of tree increased danger of wind fall of other trees 20 <br /> Tree provided privacy barrier, wind control, safety barrier, 10 <br /> light/glare shield <br /> Tree was located in area with highly erodible or unstable soils 10 <br /> Tree provided habitat for threatened, endangered or other protected 25 <br /> species <br /> 2. Failure to Adhere to or Complete a Condition of a Permit. Each condition of a <br /> permit not adhered to or completed constitutes a separate violation. Each day the condition exists <br /> beyond the correction time of the Notice of Violation or Notice to Correct constitutes a separate <br /> violation. <br /> Penalty Calculation <br /> ((A +C+ E +G) =100), times M x Z where: <br /> A = Number of past Tree Preservation violations times 10 <br /> C = Cause where, unavoidable accident = 0, negligence =20, intentional =25 <br /> E = Effort to correct the violation point total (see Table E) <br /> G = Gravity/Magnitude component point total (see Table G) <br /> M = maximum. penalty allowed <br /> Z = "0" If cause is an unavoidable accident, "1" if cause is negligence or intentional <br /> TABLE E: Effort Points <br /> Major Effort - Took all steps feasible to correct violation within 0 <br /> time frame <br /> Moderate Effort - Took some steps to stabilize situation or to 5 <br /> correct violation within time frame, additional effort required, <br /> gravity and magnitude improved by effort <br /> Administrative Order - 12 r: \adminord \rule \OOtreeremlao.wpd(01 /28/00) <br />