C = Cause where, unavoidable accident = 0, negiigence =20, intentional =25 <br /> F = Effort to correct ±h# violation point total (see Table E) <br /> G = Gravity/Magnitude component point total (see Table G) <br /> M = maximum. penalty allowed <br /> Z = "0" If cause is an unavoidable accident, "1" if cause is negligence or intentional <br /> TABLE E: Effort Points <br /> Major Effort - Took all steps feasible to correct violation within 0 <br /> time frame <br /> Moderate Effort - Took some steps to stabilize situation or to 5 <br /> correct violation within time frame, additional effort required, <br /> gravity and magnitude improved by effort <br /> Little or No Effort- Took minimal or no effort to correct 10 <br /> violation- violation still exists with same or increased gravity <br /> and magnitude <br /> Hindered Effort - Withheld information, provided false 20 <br /> information or otherwise hindered efforts to correct violation <br /> TABLE G: Gravity/Magnitude Points <br /> Failure to adhere or implement condition creates health and 30 <br /> safety risks to persons or property <br /> Failure to revegetate or otherwise stabilize up to 25% of 5 <br /> required area <br /> Failure to revegetate or otherwise stabilize 25 -50% of required 10 <br /> area <br /> Failure to revegetate or otherwise stabilize 50 -75% of required 15 <br /> area <br /> Failure to revegetate or otherwise stabilize 75 -100% of required 25 <br /> area <br /> Failure to stabilize steep slope (25% or more) 10 <br /> Failure to stabilize moderate slope (10% to 24 %) 5 <br /> Administrative Order - 12 r: \aamlnord\r le\ootreerem2ao.wpa(o3n4 /OO) <br />