Utilities <br /> Utility lines are typically laid within the street right -of -way. The placement of utilities is <br /> determined in the subdivision or PUD approval process. Currently, utilities (other than sewer <br /> lines) are place either in the street, or, in areas with setback sidewalks, within the planting strip <br /> adjacent to the street. Utilities are "stacked" whenever possible by utilizing a common trench for <br /> water, electrical, natural gas and cable service (telephone ? ?) <br /> MORE MORE MORE <br /> Recommendations: <br /> 1. Amend Design Standards for Eugene Streets, Sidewalks, Bikeways and Accessways to <br /> include standards for placement of utilities beneath sidewalks. <br /> 2. Amend section of the Eugene Code to <br /> 3. <br /> 4. <br /> 5. Bicycle and Pedestrian Connections <br /> 6. Transit Routes <br />