. U (o/ 1 aiii et() ( Ukig ii ) <br /> Plan Review For Robbie Park Option A <br /> 10/10/02 Land Use Referral # S9814 <br /> Street Name Street Linear Driveways Visual Clear Zones Other Infrastructure Adjusted divided by <br /> Description , Type R/W Ftg # of Wd /ft Lin Ftg # of I Wd /ft ILin Ftg # of Wd /ft Lin Ftg Lin Ftg 30' Cost <br /> ae <br /> '1:1 Ave Local 1 113 01 20 0 1 15 15 0 0 0 98 31 $900 <br /> 1 <br /> Notes: <br /> Julia Lp Local 1 1480 191 20 3801 6 15 90 01 0 0 1 10101 341 $10,200 <br /> Notes: <br /> Maria Lynn Ave Local 1 206 01 20 01 2 15 30 0 0 0 176 61 $1,800 <br /> Notes: <br /> Robbie St. 1 Local 1 1195' 131 20 2601 5 15 75 0 0 0 C 860 1 291 $8,700 <br /> Notes: <br /> (p / T ° 214 it - 7 2 <br /> 2�2q9,1 Total Calculated Cost: $21,600 <br /> 10% Mortality Rate: $2,160 <br /> 4 5 -Fveet 1 1 r G °LAd 1 ns 41,-, TOTAL: $23,760 <br /> 1 0 i g I z..c) o-z_- <br /> Page 1 of 1 1 <br />