v • • <br /> Street Light Construction Notice DE.500.FRM.01 -00 <br /> STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: City of Eugene EWEB DRAWING #: <br /> EWER MAP #: E -10T <br /> DATE: March 17, 2014 <br /> City of Eugene -PWM (Maintenance) ❑ <br /> City of Eugene -PWE (Capital /PEPI) <br /> The Eugene Water & Electric Board contemplates equipment changes or additions that will affect your <br /> street light equipment. These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> MEADOWVIEW PARK PHASE 2 <br /> Developer's Name: Hayden Homes, LLC Eugene Water & Electric Board <br /> Telephone #:(800) 923 -6607 <br /> COE Rep' s Name: Kris Olson Prepared By: Keith Jurasevich <br /> Telephone #: 541 - 682 -4961 Telephone #: 541 - 501 -2075 <br /> PO #: GJN #:4662 <br /> Existing Mast Arm Acceptable ❑ Existing Mounted Height Acceptable ❑ <br /> Not Acceptable ❑ Not Acceptable ❑ <br /> Maximum Luminaire Height <br /> REPLY <br /> 1. Connect 6 -70 Watt (high pressure sodium) street lights as per attached drawing and bill $4.55 /month <br /> each as per EWEB J -4 street light schedule. Total: $27.30 /month <br /> 2. Mast arm length: <br /> 3. Mounting Height: <br /> 4. This company (will /will not) be interested in this ditch for joint use. <br /> 5. This company (will /will not) be interested in this pole(s) for joint use. <br /> Preliminary billing is as follows: <br /> EWEB to bill: Hayden Homes, LLC for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation:(6 X $59.00) + $67.00 = $ 421.00 <br /> Total: $ 421.00 <br /> Agency: � � � C <• Authorized Date: Vi 7 `1 <br /> Authorized By: Date: <br /> Eugene Water & Electric Board <br /> Return Signed Document to: Eugene Water & Electric Board, Attn: Administrative Assistant, <br /> Distribution Engineering, PO Box 10148, Eugene, OR 97440. <br /> Email: SupportStaff. DistributionEngineering @eweb.org <br /> Form updated 01/04/2014 <br />