. • • <br /> 1 <br /> /% <br /> it.1 / <br /> MEMORANDUM <br /> % ,, / <br /> March 3, 2014 ; <br /> ,..„ i) C.2------- - TO: EWEB ' <br /> Electric Distribution r ,'; <br /> A` <br /> FROM: City of Eugene <br /> 311(lb ,, <br /> Kris Olson <br /> SUBJECT: ENERGY BILLING CHANGE STREET LIGHTI G <br /> i <br /> Please change the flat rate billing for street lights that had a higher wattage fixture (bulb) <br /> replace with lower wattage fixture (bulb) as follows. <br /> Delete 6 each 250 watt HPS @ $10.27 per month each - $61.62 -ART <br /> Add 11 each 200 watt HPS @ $8.47 per month each +$93.17 -ART <br /> Delete 52 each 100 watt HPS @ $5.63 per month each - $292.76 -RES <br /> Add 52 each 70 watt HPS @ $4.55 per month each +$236.60 -RES <br /> Delete 18 each 200 watt HPS @ $8.47 per month each - $152.46 -ART <br /> Add 7 each 100 watt HPS @ $5.63 per month each +$39.41 -ART <br /> Delete 2 each 400 watt HPS @ $14.30 per month each - $28.60 -ART <br /> Delete 5 each 70 watt HPS @ $4.55 per month each - $22.75 -RES <br /> Add 6 each 150 watt HPS @ $7.28 per month each +$43.68 -ART <br /> Delete 5 each 100 watt HPS @ $5.63 per month each - $28.15 -RES <br /> Add 4 each 250 watt HPS @ $10.27 per month each +$41.08 -ART <br /> Add 12 each 400 watt HPS @ $14.30 per month each +$171.60 -ART <br /> TOTAL CHANGE: +$39.20 /month <br /> We replaced 52ea 100Watt fixtures with 52ea 70 watt fixtures on various COE FG poles. <br /> These numbers along with the other wattages have been confirmed during our annual <br /> group lamp project for the previous 3 years. <br />