City code and reduction of fire danger. Fire breaks or complete <br /> POS 1 MEADOWLANDS MOWING mowing of fields must continue through the fire season. <br /> Service can be contracted. <br /> POS 1 IRRIGATION REPAIRS Water in the street, standing /running water, muddy conditions, <br /> undermining streets or walks. Service can be contracted. <br /> POS 1 PARK RELATED EMERGENCY WORK Weekend locates, sign repairs, debris in street, etc <br /> Urban 2 NUISANCE VEGETATION PROGRAM Mitigation of fuel for range fires. Only this high of a priority in <br /> Forestry the months of July, August, and September. <br /> Tech This in -house system is vital to the inspection and permit locate <br /> Support 2 MONITOR AUTOMATED UTILITY LOCATE SYSTEM requests. This activity consumes little time. <br /> permitting is required by local code and administrative rule <br /> outlines standard tum -around times; inspection serves a public <br /> safety role around excavation location, excavation limits, <br /> Permit & excavation protection, excavation restoration, <br /> Inspect 2 UTILITY PERMITTING AND INSPECTION vehicle /bicycle/pedestrian control, along with protecting <br /> valuable City infrastructure (trees, open waterways, telecom <br /> facilities, irrigation, transportation facilities, and waste /storm <br /> systems); utility permitting and inspection could be performed <br /> short term by any qualified staff. <br /> required by state law; protects public infrastructure protects <br /> Permit & public and prevents health and safety related exposure to <br /> Inspect 2 UTILITY LOCATING several hazards;locating could be performed short term by any <br /> qualified staff, individual, or sub-contractor. Delays may result <br /> in damage to city facilities. <br /> :required by state law and local code; ensures proper <br /> connection to public wastewater and stormwater systems; <br /> prevents cross connections, unsanitary conditions, and protects <br /> Permit & 2 SEWER INSPECTION public from health and safety risks. Sewer inspection must be <br /> Inspect performed by certified plumbing inspectors or limited plumbing <br /> inspectors; several exempt staff currently have the necessary <br /> certification. Delays may cause a delay in occupancy or <br /> cleanup of insanitary condition.. <br /> Urban 2 YOUNG TREE WATERING Delays of a week or more will result in tree mortality during <br /> Forestry summer months. <br /> Support 2 ACCOUNTS PAYABLE Invoices must be paid to maintain the City's credit standing and <br /> to prevent significant late charges. <br /> Not being available to the public to receive hazardous reports, <br /> Support 2 RECEPTION such as missing potholes, down trees, hazardous spills, etc <br /> could be quite costly to the City. <br /> We have established relationships with outside <br /> Repairs 2 PUBLIC WORKS & OTHER SERVICE DEPTS. vendors to handle fleet and radio issues. Vendors <br /> will be aware that we need good response times on <br /> repairs for this expected period. <br /> W Water 2 WWTP Activities There are some WWTP maintenance activities that are prudent <br /> to continue. <br /> Sanitation 2 RODENT CONTROL Rodent control within sewers. <br /> Program Priority Service Description <br /> Sanitation 2 BICYCLE PATH MAINTENANCE Maintenance of some bicycle path activities. <br /> Street & Leaf pick -up will be a high priority in the fall, but could publicize <br /> Drainage 2 LEAF PICKUP PROGRAM the program to be discontinued for that season and require <br /> adjacent property owners to pick -up the leaves. <br /> Street & 2 FLOW MONITORING High priority if a major storm occurs and we did not have the <br /> Drainage opportunity for data collection. <br /> 2 <br />