New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Northbound Jefferson Closed at 15th Avenue on Monday
COE
>
PW
>
Admin
>
Public Affairs
>
2014
>
Northbound Jefferson Closed at 15th Avenue on Monday
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2014 1:50:22 PM
Creation date
6/6/2014 1:50:20 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
6/6/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br />June 6, 2014 <br /> <br />CONTACT: Jenifer Willer, Project Manager, 541-501-0376 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br /> <br />Traffic Advisory: <br />Northbound Jefferson Closed at 15 Avenue on Monday <br />th <br />Jefferson Street will be closed to northbound traffic at 15 Avenue for several days beginning <br />th <br />Monday, June 9. <br />The closure is due to the ongoing repairs to West 13 Avenue from Garfield to Washington <br />th <br />streets. Working under contract to the Eugene Public Works Department, Knife River Corporation <br />began working on the section of West 13 Avenue between Polk and Washington streets in late April. <br />th <br />Since then, crews have installed dozens of sidewalk access ramps and reconstructed the south lane of <br />West 13 from Polk to Monroe streets. <br />th <br />Crews next will reconstruct West 13 from Monroe to Washington streets. One lane will <br />th <br />remain open for vehicles to turn from 13 Avenue to southbound Jefferson Street. Northbound traffic <br />th <br />on Jefferson will be advised to turn at 18 Avenue to avoid the closure and detour at 15 Avenue. <br />thth <br />It will take several days for the contractor to complete the reconstruction work on West 13 <br />th <br />between Monroe and Washington streets and put in a drivable base pavement. Work will then shift to <br />the north side of West 13, which should go quicker because full reconstruction is not needed in most <br />th <br />locations. Eventually, the contractor will construct a top-lift driving surface the full width of West 13 <br />th <br />to finish this phase of the project. All work between Polk and Washington is scheduled to be completed <br />before the Lane County Fair opens on July 23. <br />For traffic updates and additional information about the project, go to www.eugene- <br />or.gov/traffic or follow EugenePW on Twitter. For regional traffic updates, go to <br />www.keepusmoving.info. <br /> # # # <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.