11 JDK Other Environmental Documents <br /> JDKA Water Quality and Sediment Sampling Report <br /> JDKAA Review Existing Data and Baseline 10,080 13,440 10,080 6,800 stormwater study <br /> JDKAB Sediment Sampling Contaminant Analysis 13,440 13,440 6,800 3,200 stormwater study <br /> JADKAC Section 404(b)(1) Analysis 7,600 15,000 <br /> JDKB Study Coordination and Plan Formulation Activities <br /> JDKBA Developing Metrics - Ecosystem Outputs 18,900 25,200 18,900 12,500 4,000 riparian acquis, funds waterways team in -k <br /> JDKBB Provide Input into Plan Formulation 25,200 50,400 9,153 14,597 14,000 3,400 stormwater study bank stabiliz. in -kind <br /> JDKBC Assessment of Project Alternatives 33,600 67,200 15,000 19,057 6,250 13,800 riparian acquis, funds waterways /bank stab. <br /> JDKBD Ecological Function 6,300 25,200 2,500 3,250 <br /> JDKBE Provide Project- specific Design Input (35 %) 12,600 16,800 10,810 6,000 bank stabiliz in -kind <br /> subtotal: 127,720 226,680 45,553 64,594 <br /> TOTAL for JD <br /> Sub - Product JE - Fish and Wildlife Coordination Act Report <br /> 1 JEA District Coordination 4,200 16,800 2,000 2,000 <br /> 2 JEB Preparation of Coordination Act Report 50,000 50,000 <br /> TOTAL for JE 54,200 66,800 2,000 2,000 <br /> Sub - Product JF - HTRW Studies /Report <br /> 1 JFA HTRW Preliminary Assessment Report 18,735 24,980 9,350 9,350 <br /> 2 JFB HTRW Site Inspection Report 11,241 14,988 11,200 <br /> 3 JFC HTRW Remedial Investigation Study <br /> 4 JFD Other HTRW Documents 33,098 66,197 33,098 <br /> TOTAL for JF 63,074 106,165 9,350 53,648 <br /> Sub - Product JG - Cultural Resources Report <br /> 1 JGA Site Survey Field Report 15,390 20,520 15,000 <br /> 2 JGB Data Collection and Analysis Report 23,085 30,780 20,000 <br /> 3 JGC Mitigation Plan Report 5,130 20,520 <br /> 4 JGD Memorandum of Agreement 9,235 12,312 <br /> 5 JGE All Other Cultural Resources Studies/Reports <br /> TOTAL for JG 52,840 84,132 0 35,000 <br /> Sub - Product JH - Cost Estimating <br /> 1 JHA Study Cost Estimate Updates 0 0 <br /> 2 JHB PED Cost Estimate 0 0 <br /> 3 JHC Project Cost Estimate <br /> JHCA Preliminary Cost Estimates 34,050 68,100 6,500 15,000 <br /> JHCB Feasibility Level Cost Estimates 19,600 39,200 15,000 <br /> 4 JHD OMRR&R Cost Estimate 9,825 13,100 6,800 <br /> 5 JHE Baseline Fully Funded Cost Estimate 14,350 28,700 <br /> 6 JHF All Other Cost Estimates 9,825 13,100 <br /> TOTAL for JH 87,650 162,200 6,500 36,800 <br /> Sub - Product JI - Public Involvement <br /> 1 JIA Public Meetings <br /> JIAA Studylnitiatio n - PublicSCOgngEfOrt •11.1 7,200 9,600 7,200 5,000 Public Involve officer <br /> JIAB Public Workshops 10,000 Public Involve officer <br /> JIABA Summit Meeting 1: Social, Economic and Cultural Contexts 14,400 19,200 7,000 <br /> JIABB Summit Meeting 2. Synthesis of Data 14,400 19,200 7,000 <br /> JIABC Summit Meeting 3. Principles and Guidelines 14,400 19,200 7,000 <br /> JIAC Study Conclusion Public Meeting 7,200 9,600 <br /> subtotal: 57,600 76,800 7,200 21,000 <br /> 2 JIB Documentation of Public Meetings and Comments 38,400 76,800 8,000 10,000 <br /> 3 JIC Public Comments Report 12,800 25,600 <br /> 4 JID Public Information <br /> 'JIDA _ 3,200 6,400 3,200 2,500 Public Involve officer <br /> JIDB W 9,600 19,200 3,000 3,000 2,500 Public Involve officer <br />