New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Jan 2008 Results Summary
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
Jan 2008 Results Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2014 2:30:39 PM
Creation date
6/3/2014 2:19:46 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
April 29, 2008
Document_Number
Road Fund Policy Team
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Annual funding is made available to begin to buy down the backlog of reconstruction street <br />projects at a reasonable level and within a reasonable timeframe (total estimated annual <br />funding of $8.5 million to $10.5 million). <br />Acknowledging the importance of alternative modes of transportation, adequate annual <br />funding is made available for a reasonable amount of enhancements and extensions to bike <br />and pedestrian facilities, including preservation and expansion of the sidewalk system and <br />expansion of the local on -and off - street bicycling system (total recommended annual funding <br />of $350,000 for bike and pedestrian path capital preservation). <br />
The URL can be used to link to this page
Your browser does not support the video tag.