22. PAGE 11, SOUTH HILLS: <br />a. POLICY 1: Preserve the character and habitat value of the South <br />Hills by siting and developing recreational facilities and other <br />improvements in a way that (is sensitive to) preserves and enhanc- <br />es the natural conditions of the area. <br />b. POLICY 2: Manage the South Hills as a passive recreational feature <br />by providing a variety of recreational facilities such as trails,_ <br />view points and natural areas to accommodate a range of nter- <br />es s and activities. <br />c. POLICY 4: (Extend the ridgeline pedestrian trail system to connect <br />the Willow Creek area with Lane Community College, Laurel Hill <br />Valley, and adjacent residential areas.) Extend the Rid eline <br />Trail S tem along or near the ride of HillF and <br />p rovidellnKMS T1 S. <br />• NOTE: The original language of this policy would have provided <br />specific direction for specific projects that are also covered in <br />SOUTH HILLS proposed actions. Therefore, it has been replaced by <br />more general and comprehensive language as is typically associated <br />with a policy. <br />d. PROPOSED ACTION G(5): How residential and other urban uses can be <br />accommodated (without creating significant) to minimize negative <br />environmental impacts. <br />e. PROPOSED ACTION J(2): A trail from the Dillard Road area to the <br />Laurelwood Properties and to Hendricks Park. <br />f. PROPOSED ACTION J(4): Reformat as a separate Proposed Action K(1) <br />and Proposed Action K(2) as follows: <br />PROPOSED ACTION K(1), HIGH PRIORITY: Acquire easements and <br />land for a trail network connecting Lane Community College, <br />the Oak Hills area, MooR Mountain, Hendricks Park, the Laurel <br />Hill Valley, (and) the Laurelwood (Golf Course) Properties, <br />and the Ridgeline Trail System <br />POLICY K(2), MEDIUM PRIORITY: Develop a trail network connect- <br />ing Lane Community College, the Oak Hills area, Boon Moun- <br />tain, Hendricks Park, the Laurel H.11 Valley, (and) the <br />Laurelwood (Golf Course) Properties an the Ridgeline Trail <br />System <br />23. PAGE 12, DELTA PONDS: <br />a. NEW PROPOSED ACTION, HIGH PRIORITY: Continue to ne otiate wicn <br />Valley River Center to acquire the southernmost Delta Pon <br />b. NEW PROPOSED ACTION, HIGH PRIORITY: Using the 1989 Natural Resource <br />Assessment study of the Deity POM& - us one source, devel ep rn <br />Draft Parks Plan - - Planning Commission Changes 6/20/89 Page 7 <br />