ATTACHMENT 2 <br />PARK DEVELOPMENT COSTS -- 1994 <br />General per acre costs assuming 2.5 acre minimum area: in $ <br />Grading/leveling <br />2,500 <br />Drainage (209 I.f., one area drain per acre) <br />3,000 <br />Irrigation <br />7,500 <br />Added factor for shrub area irrigation (8% of area) <br />2,000 <br />Utility set -ups (water, electricity) <br />800 <br />Concrete paths (2,000 s.f. /acre x $4.00 /s.f. <br />8,000 <br />Fees — building, storm sewer,etc. <br />500 <br />Topsoil, soil amendments <br />3,600 <br />Turf soil prep, seeding, fertilizing <br />4,000 <br />10 trees @ $150, 150 shrubs @ $20 <br />4,500 <br />Finish grade and mulch shrubs <br />400 <br />Lighting (4 lights @ $2,500) <br />10,000 <br />Furnishings (tables, benches, trash receptacles, fountain) <br />5.000 <br />Total basic costs 51,800 <br />Other lump sum costs (not per acre): <br />Fencing (6 foot chain link per I.f.) 15 <br />Basketball court (full court, high school size) 15,000 <br />Playground (neighborhood park scale, accss. features) 40,000 <br />Multipurpose sports fields constructed in pairs on 6 acres that <br />accommodate two softball and two soccer fields between infields: <br />Grading, drainage, irrigation, utilities, fees, topsoil <br />soil, soil prep, seeding from above ($21,900 per acre <br />for 6 acres =) 131,400 <br />Fencing (1200 feet = $18,000, 2 backstops = $24,000) 42,000 <br />Cambridge Drainage system (heavy soil areas) @ $25,000 150,000 <br />Bleachers, bleacher pads, furnishings, fountain 35,000 <br />Lighting (based on Ascot Park bid) 145,000 <br />Total double sports field 503,400 <br />Tennis courts -- 4 court complex, lighted (A.C.) 100,000 <br />(P.C.C.) 140,000 <br />Bikepaths per mile (12' wd, 5.5" conc. @ $3.50 1s.f. x 5280) 221,760 <br />Jogging path (with rock base similar to adidas @ Amazon) 40,000 <br />0 <br />