New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2001 Metro - POS Study
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
2001 Metro - POS Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 10:51:07 AM
Creation date
5/30/2014 8:03:06 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
2001
Document_Number
POS - Metro Study
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Schedule: August 2001 — November 2001 <br />Task -5: Produce Analysis Maps and Data <br />• Existing Open Space System <br />• Constraints to Development <br />• Historic Vegetation Patterns — 1850 <br />• Viewsheds <br />• Planned and Proposed Open Space System <br />• Photographs (aerial birds -eye photos of key features) <br />Schedule: August 2001 — November 2001 <br />Task -6: Develop Working Vision for Parks and Open Space in the <br />Metropolitan Region <br />• Use Planned and Proposed Open Space System Map as a Starting Point <br />• Assess opportunities <br />• Implement goals and objectives <br />• Hold an extended staff team brainstorm to develop /refine working vision <br />• Produce narrative describing the vision <br />• Produce refined conceptual vision map <br />• Identify early priority actions (for United Front Lobbying) <br />Schedule: September 2001 — January 2002 <br />Task -7: Implementation and Funding Strategies <br />• Research and document existing techniques <br />• Identify potential partners (government, non - profits, private) , programs, and <br />funding <br />• Works with staff team to develop a package of recommended strategies for <br />implementing the working vision <br />Schedule: January 2002 —April 2002 <br />Task 8: Elected Officials Coordination <br />• Meet with MPC as needed (MPC will serve as the policy oversight body for <br />this study). <br />• Prepare quarterly updates to Springfield and Eugene City Councils, <br />Willamalane Board, and County Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.