New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2001 Metro - POS Study
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
2001 Metro - POS Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 10:51:07 AM
Creation date
5/30/2014 8:03:06 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
2001
Document_Number
POS - Metro Study
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5P r,.3� C10`1d/Gl,l/ /ate <br />DRAFT <br />United Front Open Space Projects <br />(not in priority order) <br />Common theme or thread might be: Rivers and Ridgelines or County in the City. <br />For those projects that meet the appropriate criteria, we'll put more detail on these bones. <br />O1 0 1 <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />o � 10. <br />11. <br />0� 12. <br />Continued appropriation for Mill Race restoration project from Water <br />Resources Development Act (WRDA). <br />Coburg Hills <br />Citywide package that includes development in floodplain, stormwater <br />integration, update of FEMA maps, protection of natural drainageways <br />Jasper/Natron - integrated stormwater management plan <br />Community -scale park north of Jasper Road, between 42 and 58` <br />(Weyerhaeuser Hal Road bisects site) <br />- PolatGIrl}Pa`k <br />Willamette Heights - purchase it for protection <br />kr Path - from Dorris Ranch to Clearwater Park along the north bank <br />o the river <br />Willamette Riverfront from Filbert Grove to I -5. A package that would <br />include biological assessmentibaseline study; restoration; integrated <br />stormwater management; parkland acquisition; infrastructure installation <br />Oxbow Park - a package that would include public access, protection of <br />wellfield, water quality <br />Open Space/Park that would connect the Guistina property at 32 south to the <br />Millrace (includes property owned by Springfield School District) <br />Cedar Creek - purchase of conservation easements along the creek corridor <br />
The URL can be used to link to this page
Your browser does not support the video tag.