New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Proposal POS Implementation Analysis & Proposal
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
Proposal POS Implementation Analysis & Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 10:51:06 AM
Creation date
5/29/2014 2:43:51 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
October 18, 2000
Document_Number
POS 2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• the relationship between the two divisions for maintaining the open and closed <br />stormwater systems (Maintenance and Parks & Open Space) would be similar to the <br />relationship Maintenance has with Facilities where buildings are located on Parks <br />Property. <br />• teamwork may be diminished when you split up the divisions, but can be workable. <br />C. Role of the Division in Emergency Operations: Shared resource for the interim. Allow <br />the new department director and POS division manager to determine if this needs to <br />change. <br />D. Role of the Weekend Supervisor: Shared resource for the interim. Allow the new <br />department director and POS division manager to determine if this needs to change. <br />E. Maintenance of Water Quality Facilities: If the feature is primarily non - structural (hard <br />scape), it's in the new POS division. Others would be in Maintenance. <br />F. Development Review: Keep current structure where PWE provides coordination role <br />with POS staff doing some review. Providing assistance to the outside would continue to <br />be provided by PWE staff (Joe's group). <br />G. Wetlands Design and Construction: Similar to how wetland design & construction is <br />currently done, however, Wetland responsibility would be in the new division. <br />H. Administrative Support: Maintenance can provide core service (payroll, personnel <br />functions, customer service). Would recommend an assessment of program support for a <br />new division. May have an unmet need for contract management and grant applications. <br />I. Technical Support: Maintenance can provide core service. Would recommend an <br />assessment of program support for a new division. <br />J. Landscape Architects functions (where do they go): <br />Functions <br />1. Concept Plans <br />2. Design Development <br />3. Permitting <br />3. Plans and specs <br />5. Contract Development <br />6. Construction, Project Management, Inspection and Contract Management <br />Agreement None. This was the most difficult decision for the team. It was decided that <br />this issue needs to be addressed in the future. <br />Advantages to moving the three en ing eering LAs to new division <br />• same geographic location encourages coordination <br />• more coordination between design function and implementation (in the Parks & <br />
The URL can be used to link to this page
Your browser does not support the video tag.