New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Work Begins on 2014 Road Repair Projects in Eugene
COE
>
PW
>
Admin
>
Public Affairs
>
2014
>
Work Begins on 2014 Road Repair Projects in Eugene
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 10:19:20 AM
Creation date
3/18/2014 10:19:18 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
3/18/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br />March 18, 2014 <br /> <br />CONTACT: Jenifer Willer, Pavement Preservation Program Manager, 541-501-0376 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br />Work Begins on 2014 Road Repair Projects in Eugene <br />Another busy road repair season is under way in Eugene. <br />Wildish Construction began mobilizing equipment on Goodpasture Loop in north Eugene late <br />last work and work began Monday on sidewalk access ramp installations and repairs. The sidewalk <br />work will be followed by a pavement overlay the full length of the loop and some reconstruction work <br />in the commercial area on the north end of the loop. Work on that project is projected to be completed <br />by mid-May. <br />Over the next several months 17 major street repair projects are scheduled around the city. <br />The projects include: 1st Avenue (Washington to Van Buren), 13th Avenue (Bertelsen to Commerce), <br />13th Avenue (Washington to Garfield), 43rd Avenue (North Shasta to Dillard), 46th Avenue (Donald to <br />Willamette), Broadway (Mill to Pearl), Coburg Road (Ferry Street Bridge to 50 feet south of EWEB off- <br />ramp), Donald Street (46th to Fox Hollow). Firland (Spring to Agate), Goodpasture Loop Road, Interior <br />Street (north end of cul-de-sac to south end of improved section), Madison Street (1st to 8th), Marshall <br />(Hughes to Echo Hollow), Monroe Street (1st to Blair), Olive Street (11th to 13th), Roosevelt <br />Boulevard (Danebo to Terry), and Shasta Loop (Spring Boulevard to 43rd), as well as 20 residential <br />street segments that will receive slurry seal treatments. <br /> Crews from Eugene Water & Electric Board, Northwest Natural and other utilities have been <br />working for months to adjust their utilities before the City begins its road work. One stretch that’s <br />recently been under construction by EWEB is 13 Avenue from Garfield to Washington streets. That <br />th <br />road repair project is scheduled to begin in mid-April and will include reconstructing much of the <br />existing roadway. <br />(more) <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.